The Burlington Hotel now trading as DoubleTree by Hilton underwent a 16 million euro refurbishment when taken over by Blackstone. The scope of works included strip out and re-fit out of the restaurant, bar, lobby, ballroom and 500 guest bedrooms. The entire works were carried out in a live hotel environment with minimal disruption to existing services. King and Moffatt were responsible for the full electrical installation on this project.