Residential Archives - King and Moffatt

Blog Archives

Crows Nest Student Accommodation

King & Moffatt have delivered the electrical services on the Crow's Nest Student Accommodation in Cork city. The development consisted of student accommodation, a health care centre and ancillary facilities. The development split over 4 accommodation blocks ranging in height from 7 to 9 floors, comprises a floor area of 8,700m2 Student Accommodation (255 ensuite bedrooms in 66 apartments), a Health & Wellness Centre and a café.    

Read More »

StayCity Aparthotels – Mark Street, Dublin

King & Moffatt carried out the electrical installation on the StayCity Aparthotels on Mark Street in Dublin. This project involved the delivery of 142 studios and one bed apartments over five floors. Each apartment came equipped with a kitchen, living room and ensuite. The ground floor of the StayCity Aparthotels has a reception, Staycafé , on-site guest laundry, office area and gym for its residents. There are also garden area's...

Read More »

Alexandra College Campus

King & Moffatt's work on Alexandra College consisted of electrical works on the Hermione Building on the college's campus. This project was part of Alexandra College's second phase of their development plan. The Hermione Building sits at the heart of their Milltown campus, immersing students in campus life and allowing students the opportunity for full involvement in school life and extracurricular activities. The building features community spaces on the ground...

Read More »

Battersea Exchange Phase 2

King & Moffatt completed the mechanical and electrical works on this Design & Build residential project in London. The project comprised of 7 blocks of apartments ranging in height from 3 storeys to 16 storeys. There was a total of 78 apartments in the development.

Read More »

Cherrywood TC2

Cherrywood TC2 consists of two apartment blocks consisting of a total of 384 units, over a basement carpark. The structure is a concrete frame with transfer slab above the carpark. The development is adjacent to the Cherrywood Luas stop and involves developing basement and connection linkages underneath the elevated Luas track. King & Moffatt Building Services are currently completing the Electrical services package on this project.

Read More »

22 Hanover Square

Clivedale’s redevelopment of 22 Hanover Square will comprise of 41 apartments, a 51-bedroom Five-Star hotel, restaurant and spa with indoor swimming pool. When complete the project will be Mayfair’s only fully integrated serviced residential scheme with residents benefiting from the hotel service offering, whilst having the privilege of their own exclusive private spaces and amenities. The development is part of the wider Hanover Square master plan. King & Moffatt Building...

Read More »

Church Street Student Accommodation

King & Moffatt completed the electrical services on this project, which was a student accommodation development comprising 32 ‘House’ units ranging in size between 5 bed space and 8 bed space units - 217 bedrooms in total comprising 212 single bedrooms (including 5 disabled rooms) and 6 twin bedrooms, together with ancillary student accommodation facilities, such as social space, gym (and associated changing areas), pool room, laundry room, management office,...

Read More »

Carman’s Hall Student Accommodation

King & Moffatt were responsible for the electrical installation on this student accommodation scheme which comprised of three residential buildings between five and six storeys, containing 207 high-specification en-suite bedrooms arranged in cluster apartments of between three to eight bedrooms. Based in the heart of Dublin city close to Trinity College, the property features communal areas, including a common room, cinema room, gym and study room, a management suite, bicycle...

Read More »

Dalston Kingsland FiftySevenEast

This new luxury residential building in Dalston, East London, was a design and build project, undertaken fully by our in-house M&E design team. King and Moffatt’s scope of work consisted of the full Mechanical, Electrical and Fire Protection packages. The development consisted of 98 luxury apartments and stands at fifteen stories tall. It was completed for the client Taylor Wimpey in October 2017. This project won the “International Project of the...

Read More »

Robswall Housing Development

Luxurious new homes in the historic village of Malahide, Dublin's premier coastal address - just 10 miles from the City Centre.  The gently elevated setting at the edge of the coast in Malahide provides a natural backdrop for these very special new homes. King & Moffatt were responsible for the electrical installation on this project which has been ongoing for a number of years and is currently on phase 6...

Read More »